Supply and distribution board
Bringing the supply into the shed, placing a distribution board where it can be reached and kept dry, and arranging protective devices so a fault on one circuit does not leave the whole building dark.
STEPHEN BROWNELECTRICAL Agricultural Electrical Services
A farm shed might hold feed, machinery, stock or a workshop, and its wiring should suit the job the building does. Stephen Brown Electrical installs shed electrics from Markethill, from a single lit store to a multi-bay building.
A bare steel frame or a block-built shed has no electrics of its own until someone decides where the supply arrives, where the board sits and how far each socket and light needs to reach. Making those decisions before the cladding goes on saves cutting into finished surfaces later, so we like to speak with the farmer and the shed builder while the building is still an open frame. The aim is a layout that makes sense on the first morning and still makes sense when the shed changes use.
Sheds rarely stay as first planned. A grain store becomes a calf house, a lean-to turns into a workshop, and a second welder or feed auger appears. For that reason we ask what the building does today and what it might do in future, then leave sensible room in the board and along the cable routes. We work on new builds, extensions and older sheds that have had little electrical attention, with the scope agreed before anything is ordered.
Bringing the supply into the shed, placing a distribution board where it can be reached and kept dry, and arranging protective devices so a fault on one circuit does not leave the whole building dark.
Socket outlets sited for the equipment that will actually be plugged in, such as pressure washers, hand tools and heaters, with enclosures and mounting heights chosen with damp and washdown in mind.
Fittings laid out over feed passages, benches and storage bays so working areas can be seen properly, with switches placed at the doors and gates that people really use each day.
Cable runs planned along rafters, walls and ducting, kept clear of machinery, vermin and accidental knocks, and tidy enough that a later electrician can follow exactly what was installed.
Local isolation and connections for fixed equipment such as augers, fans or compressors, so a machine can be switched off at the point of use before anyone starts cleaning or repairing it.
Ring or message with the size of the shed, what it will be used for, whether a supply already reaches the site and when the structure is expected to be finished or roofed.
We look at the frame or walls, note where equipment will stand and talk through socket, light and board positions with you and, where one is involved, your shed builder.
You receive a written quote listing what is included, what is left out and what assumptions it rests on, so the work can be compared with what you expected before it starts.
We carry out the agreed wiring around the other trades, complete the relevant checks, point out where the board and isolators are, and provide the documentation for the work done.
Stephen works from Markethill, and farm shed installations are carried out across County Armagh and neighbouring areas such as Armagh, Portadown, Lurgan, Newry, Dungannon, Lisburn and Belfast, within roughly 40 miles of base. For detail on particular places, see the town pages listed beneath.
Often yes, and it is usually easier that way. Cable routes and boxes can be fixed to an open frame without cutting into finished walls. Tell us your build programme so the electrical stage fits around the other trades.
That depends on what the existing supply already feeds and what the new equipment will draw. We look at both during the visit. Any change to the incoming supply is arranged with the supply company, and we can explain how that would work.
Yes, where the existing board and cable routes allow it. We check what is already installed first, because adding sockets to an unsuitable board can create more problems than it solves, and we will say so plainly.
A rough idea of what will be plugged in or run, where you would like lights and switches, and any drawings from the shed builder. If you have none of these, we can work it out together on site.
Yes. We are happy to agree timings and access with your builder so wiring goes in at a sensible stage, and so nobody has to open up cladding or concrete to fit something that was missed.
Request a quote
Tell us what the shed is for, how big it is and where you are in the build, and we will find a time to come and see it. You will get a written scope before any work is booked in.
07833 228966