Full house rewires
Every circuit is renewed from the new board outwards: lighting, sockets, cooker and shower feeds, with new accessories to match. The work is staged room by room so the household knows where power is off.
STEPHEN BROWNELECTRICAL Domestic Electrical Services
A rewire replaces ageing cables, accessories and protective gear, either throughout a house or in the rooms being renovated. Stephen Brown Electrical plans the work around your household and the structure of the building.
Wiring does not wear out on a fixed date, but rubber-sheathed or cloth-covered cables, brittle insulation, scorched sockets and a patchwork of past additions are all reasons to have a house looked at properly. A rewire means taking out old circuits and installing new cable, accessories and a new distribution board, then proving everything by test. It is disruptive, so we spend time up front explaining which parts of the house will be affected, which floors or walls need to be opened up, and what can sensibly be kept.
A partial rewire is different: a single floor, an extension, or the rooms being stripped back during a renovation. Many owners choose this route when the rest of the installation tests acceptably. Whether the work is full or partial, the principle is the same. We agree the extent, the number of points in each room and the order of working before we start, so the job proceeds without surprises for you or any other tradespeople on site.
Every circuit is renewed from the new board outwards: lighting, sockets, cooker and shower feeds, with new accessories to match. The work is staged room by room so the household knows where power is off.
If only the kitchen, an upstairs floor or an extension needs new wiring, we can limit the work to those areas and connect them to the remaining installation once its condition has been checked and found suitable.
When walls are stripped to brick or floors lifted, it is the best moment to renew cabling. We time first-fix visits to the builder's programme and agree socket and switch positions before plaster goes on.
A rewire is a sensible time to review the consumer unit along with the earthing and bonding. We note what is found, explain which changes we would suggest, and include any agreed changes in the written quote.
Chasing walls and lifting floorboards creates mess. We lay dust sheets, lift boards carefully, refit them afterwards and tell you which plaster or decoration remains for other trades to finish.
Tell us the age and type of the house, any problems you have noticed, and whether it will be occupied during the work. Earlier reports or photos of the existing board are useful to have to hand.
We walk through every room, check the board, look at accessible cabling and agree points per room. A written quote lists the circuits, the number of sockets and lights, and anything excluded.
Old cable is disconnected and removed where practical, new cables are run and back boxes fitted. You are told when power will be off, and temporary supplies are discussed where a household is living in the property.
Accessories, lighting and the new board are connected, then every circuit is tested. We walk you through the result, label the board, and supply the documents that go with the work.
We work from Markethill and take on rewiring in Belfast and Lisburn, Newry, Banbridge, Dungannon and Armagh, plus Lurgan, Craigavon, Portadown and the villages between them, usually within about 40 miles. Each town page below gives more local detail, so use whichever matches your address most closely.
That varies with the size of the house and how the work is staged. We plan circuits so some rooms stay usable where possible, and tell you in advance when supplies will be isolated, so you can plan around cooking, heating and working from home.
Some households stay, others move out for the heavier days. It depends on the property and how many people live there. We discuss the options at the visit and can sequence the work to leave at least one area usable.
Cables have to be hidden somewhere, so some chasing and floor lifting is normal. We use existing routes where they are suitable, lift boards carefully and point out where plastering and decorating will be needed afterwards from another trade.
Yes, many people rewire a floor at a time or tie the work to renovation phases. We agree what each stage covers, make each stage tested on its own, and record what remains to be done later.
On completion you receive the paperwork that goes with the work carried out, such as test results and certification as appropriate. Keep it with your house records, as a buyer, landlord or insurer may ask to see it.
Request a quote
Tell us about the house and what has prompted the question, and Stephen will explain whether a full rewire, a partial one or a smaller repair looks the better fit. Reach the Markethill office to arrange a visit.
07833 228966