Dungannon
Dungannon, a short hop away, has gap sites and edge plots where a single house fits.
STEPHEN BROWNELECTRICAL County Tyrone · Self-Build Electrical Installations
Building your own home in Moy means the electrics must be planned before the first block goes down. We act as owner-builder's electrician, from first sketch to final test.
Plots in Moy are mostly small. A gap beside an older house, a field edge on the road out of the village or a farm building waiting for conversion are typical. Because the village stands on the Blackwater, low ground nearby can be wet, and that affects choices such as cable type, duct depth and where the board sits. Seeing the site ahead of final plans lets us trace the nearest services and note anything that could complicate the supply, which is far easier to sort out on paper than in an open trench.
Owner-builders often know least about the electrical side, so each stage is explained in plain terms, decisions are split between you and us, and the scope is written down. Cable goes into the shell first, the fittings are connected second, and testing and certification close the job. Because the village is small, neighbours often take an interest, so we keep the site tidy and let people know when noisy work is planned, which helps a self-build feel less disruptive. A small village also means the owner may know several neighbours, so we say in advance when noisy work such as chasing or drilling is planned and keep deliveries off the narrow lanes at busy times.
Moy work starts by reading the plans, then advising on the supply and board, followed by wiring at first fix, fitting and connecting at second fix, links to heating and hot water, and final tests with a certificate. Quotes are written for every stage, and storage and delivery arrangements keep the programme on course.
Dungannon, a short hop away, has gap sites and edge plots where a single house fits.
Armagh and its surrounding villages have plots on settlement edges and replacement houses in the country.
Loughgall has orchard-country plots with farm buildings suited to conversion.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Dungannon | Roadside. | Along the high road. | Gap sites. |
| Armagh | Lane. | By the track. | Replacement houses. |
| Loughgall | Gateway. | Up the orchard lane. | Conversions. |
Moy is a short hop from our Markethill base, so a meeting on site before foundations and a visit for each fix are easy to arrange.
Imagine a couple building beside the village. We would look over the drawings with them, explain where the supply could come in, mark sockets and switches, wire the shell at the first stage, and come back after decoration to fit and test, handing them a plan of the board and buried cable.
Winter is the time to settle the electrical design for Moy sites, many of which get under way in spring.
A wide Georgian square lies at the centre of Moy and gives the village its setting.
Low ground lies around the village, which stands beside the Blackwater.
Moy stands on the Tyrone bank, directly opposite County Armagh.
Yes. Early guidance on circuits and supply is easiest to act on while drawings are open to change.
It can influence cable type and duct depth, so we plan for it from the start.
The owner makes the application, and we help with the details it needs.
Often, yes, but connections and testing must be done by us.
Yes, the finished installation is certified.
The scope is reissued in writing and any change is agreed before work starts.
A set of plans, the address and a rough timetable to start.
Request a quote
Planning a self-build in Moy? Send us the plot details on the form and a site meeting can be arranged.
07833 228966