When you take an empty unit and turn it into a shop, office or workshop, the electrics must follow your layout. We wire the counters, desks, benches and lighting once the plan is settled, working from Markethill.
A fit-out begins with a shell: bare walls, a floor and a supply, and perhaps some leftover wiring from the previous occupier. The electrical side then turns on the layout drawn for the new business. Till points, display lighting, desk power, kettle circuits and machine supplies all depend on where furniture and equipment will actually stand. We wire to that layout, which is why we like to see the plan, or at least a sketch, before fixing any back boxes or running cable into the ceiling void.
Fit-outs run to tight deadlines because rent is usually due whether the doors are open or not. That means the wiring has to be sequenced with joiners, plasterers, shopfitters and decorators, with first fix done before walls are closed and second fix completed before the final coats go on. We agree stages with whoever is running the project, say plainly when we need access, and tell you promptly if a change on site affects electrical work already planned.
Supplies for tills, card machines, security equipment and illuminated displays, with floor boxes or wall outlets positioned to suit the counter design, fixed shelving and the route customers walk through.
Socket banks and outlet positions for desks, printers and meeting rooms, usually alongside a separate allowance for data cabling by your IT supplier, so cables are not left trailing across the floor.
Heavier supplies for benches, welders, compressors and extraction, with isolators within reach of the operator and circuit ratings chosen for the actual equipment you plan to run.
General lighting arranged around partitions and storage, with separate switching for staff areas, display zones and back rooms, so lights can be altered when the room arrangement changes.
Small distribution boards serving the fitted space, with each circuit labelled in plain language such as tills, kitchenette or compressor, helping staff and later electricians find what they need quickly.
Tell us what the unit will become, the date you hope to open and who is running the fit-out. Send any layout drawing or sketch, and we will arrange a time to view the premises.
We check existing wiring, the board and the routes available, then write down the circuits and outlets we propose, along with anything the existing installation may limit, for you to approve.
Cabling and back boxes go in ahead of ceilings and wall finishes; sockets, switches and fittings follow once decorating allows. We keep to the agreed order and flag any clash with other trades.
Every circuit is tested and the board labelled, then we demonstrate isolators and switching to you or your manager. Any snagging noted at the final walk-round is dealt with before the premises open.
From our base in Markethill we wire shops, offices and workshops throughout County Armagh and nearby districts, covering Lisburn, Belfast, Lurgan, Craigavon, Armagh, Newry and the places in between. Most jobs fall within roughly 40 miles of Markethill, and each town page below adds local detail.
Yes. We agree the stages with your shopfitter or project lead, then attend when first fix, second fix and final connections are due. If the programme moves, tell us as early as you can so we can rearrange visits without leaving the job idle.
That is usually a separate specialist, chosen by you or your IT supplier. We can fit the containment, back boxes and power supply for data cabinets and agree where the outlets sit, leaving the cabling and equipment itself to them.
Usually yes, once we have checked the existing circuits can take the change. Landlords sometimes limit what can be altered, so check your lease terms first, and we will describe in writing exactly what we propose to change.
We can still start with the supply, board and core containment, then leave outlet positions until the layout is confirmed. Fixing positions too early often means moving them again, so waiting for the final plan on those items can avoid rework.
In some cases yes, particularly when a premises is already trading. Tell us the hours the building is available, and we will say what can sensibly be done in those windows and what needs a longer closure.
Request a quote
Send us the plan, or simply describe how you want the unit to work, and we will visit and put the wiring scope on paper. Once you are happy with it, we can agree start dates that suit your opening schedule.