Call us07833 228966

County Armagh · Commercial Rewires & Upgrades

Commercial Rewiring and Upgrades in Craigavon's Mixed Business Units

Craigavon's offices, shops and business units were built in stages, and the oldest are now due for renewal. A rewire here means matching the electrics to how the unit is used today.

Call 07833 228966

Electrical work around Craigavon

Where other districts grew from an old centre, this one was drawn on paper, and its commercial buildings went up in phases to a common pattern. A unit from an early phase often has suspended ceilings, surface trunking and a board that has outlived several tenants. Meanwhile its use has probably changed: a shop became an office, an office became a clinic, a store became a gym. Each change added load and rearranged rooms, and the wiring did not always follow. We survey the unit, find out what each circuit serves and plan the renewal around the use it now has.

Because neighbouring units are often occupied by other businesses, we pay attention to common supplies and shared walls, checking where one tenant's circuits end and another's begin. Where the building has a common riser or a shared meter, we agree access with the managing agent before work starts. The new installation is designed with containment that stays tidy, spare ways on the board for growth and labelling that a later electrician can follow. Every circuit is tested, and the certificate is written for the tenant and, if wanted, the landlord. Containment is worth getting right, because it decides how easily the unit can change. Trunking sized for growth, clear labelling on both ends of every cable and a cable schedule that matches the board mean that moving a desk, adding a printer or fitting a new meeting room is a half-day job and not a rebuild. We hand over the schedule and the test figures together, so any later electrician starts from facts and not from guesswork.

About this service

A walk through the unit opens the first visit, with testing of the supply and sampling of the existing circuits. The proposal that follows names the new board, circuits, lighting, sockets and data containment, and sets a staging plan around your hours. Following that plan, the work is done and every circuit is tested before an electrical certificate is issued.

Renewing the electrics of an older planned-district unit

Business streets and estates beside Craigavon

Lurgan

Lurgan is a market town on the far side, with old terraced shops and edge-of-town units.

Portadown

Next door lies Portadown, with a busy centre and conversions in its older streets.

Richhill

Richhill, the large village south of Craigavon, has small business units on its edges.

Practical notes by area
AreaVan parkingAccessTypical jobs
LurganLoading bay.Via manager.Terraced shops.
PortadownStreet.With owners.Town offices.
RichhillRoadside.By phone.Village units.

Travel from Markethill

A survey in Craigavon takes a morning because business units are easy to find, and staged work can be booked around your hours.

A typical enquiry

Suppose a small clinic in an early-phase unit, with a tired board, surface trunking everywhere and not enough sockets. We would renew the board, replace the circuits room by room over two weekends and test everything before the first patients return.

Timing the work

Autumn is a busy period for rewires, as firms plan for the new year.

Local knowledge

On paper first

Craigavon was on paper before it was built.

Phased building

In stages, around a planned layout, the district grew.

Mixed neighbours

Offices, shops and business units stand shoulder to shoulder in the district.

Questions we are asked

How is a shared riser handled?

Access is agreed with the managing agent first, and the work stays within your side of the boundary.

Can a unit stay in use during a rewire?

Often, if work is staged in rooms and the supply is restored each evening.

Why replace surface trunking?

Old trunking may be overfull or damaged, and new containment allows tidy, safe expansion.

Will spare capacity be left on the board?

Yes, ways are left for future additions.

Can data cabling be included?

Yes, alongside the power wiring.

What paperwork follows the rewire?

A certificate, signed, giving the result for each circuit, plus a labelled board.

What would be useful to include in a first message?

The address, the use of the unit and a note of any recurring faults.

Request a quote

Commercial Rewires & Upgrades in Craigavon

Is a Craigavon unit due for rewiring? Describe the unit through the form and a survey will be arranged.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966