Lurgan, next door, has infill plots where one or two houses are finished at a time.
STEPHEN BROWNELECTRICAL County Armagh · New Build Testing, Certification & Handover
New houses in Craigavon often finish in groups, which makes an orderly handover especially important. We test each installation, record the results and make sure the new owners understand what they have been given.
The district was planned as a whole and its estates were built in phases, so new houses are often completed several at a time. A developer with a row of homes wants them tested, signed off and ready for buyers in a sensible order, without the electrician holding up the sales programme or the sales programme rushing the electrician. We agree a sequence with the site manager, test house by house and keep a tidy record for each, so the paperwork for a street is as consistent as the houses themselves.
Every circuit is worked through at each visit; we confirm that the protective devices trip, that earthing and bonding are sound and that the board carries clear labels. Then we leave the results with whoever the developer names. Buyers moving into a new estate house are often unfamiliar with the board, so where the developer arranges it we show them the main switch, the sockets that matter most and what to do if something trips. Where a test shows a problem, we fix it and retest before anyone gets the keys. A tidy handover also helps later. Because Craigavon houses so often share a layout, a clear record of one home can guide the next, and an owner who calls years afterwards with a tripping circuit will find the board labels and our notes match what is behind the wall.
In Craigavon we work through each new house one circuit at a time: protection devices proved, earthing and bonding examined, board labelled. The job closes with a written record and a certificate covering our own work. A developer with a whole street to finish gets an agreed handover sequence and paperwork laid out identically for every house.
Lurgan, next door, has infill plots where one or two houses are finished at a time.
Portadown, to the south, has sites on its edge where larger groups of homes are completed together.
Waringstown has the occasional new house among its older cottages, each needing a separate visit.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Lurgan | At the kerb. | By the show-home entrance. | Small completions. |
| Portadown | Inside the site. | Down the new estate road. | Groups of houses. |
| Waringstown | On the lane. | By the gate. | Single new houses. |
The road from Markethill to Craigavon is easy, so a test visit, a retest and a handover walk-through can be fitted together around the sales schedule.
Suppose a developer is finishing six houses along a new street. Each house would be tested in the order agreed, every board labelled the same way, and the full set of papers passed to the developer once for the sales files.
Completions often cluster before winter, so booking tests early prevents a rush at the end of the building season.
Craigavon's estates went up in stages, so new houses often finish in groups.
Many homes share a pattern, which helps consistent labelling and records across a street.
Parkland and lakes shape the district, and external lighting circuits nearby need careful testing.
Yes. We agree an order, test house by house and keep the records consistent.
The measured results and a certificate for our work, each page explained in plain words.
The fault is corrected and the circuit tested again before the keys pass to the buyer.
We note where our work ends and who looks after any communal supply.
Yes, if the developer arranges a visit, we show them the key points.
Once second fix dates are fixed, so that testing follows hard on its heels.
Yes, along with any supply to garages or outbuildings.