Craigavon
Craigavon's estates share common wiring and boards from street to street.
STEPHEN BROWNELECTRICAL County Armagh · Consumer Unit & Fuse Board Upgrades
Plenty of Lurgan houses still run from a fuse box with ceramic fuses, a wooden backing board and a tangle of cable underneath. Swapping that for a modern consumer unit is one of the most useful jobs an electrician can do in a house, and one we carry out across the town.
The consumer unit is the heart of a home's electrics. Every circuit starts there, and every safety device that protects the household sits inside it. An old fuse box lacks the protection against shock and fire that a modern board provides, and it often has no spare ways for the circuits a modern family needs.
In Lurgan's brick terraces the fuse box usually sits under the stairs or in a cupboard by the front door, with the meter beside it. Replacing the board there means working in a tight space, so we plan the job, bring the right tools and cover the floor before the first screw is turned.
A consumer unit change starts with a test of the existing circuits, because even the best new board cannot make a poor cable safe. We then isolate the supply with the network operator's meter arrangements in mind, remove the old board, fit the new one, reconnect and label every circuit, and test the whole installation before power is restored for good.
Craigavon's estates share common wiring and boards from street to street.
Moira has cottages and larger houses on quiet roads.
Portadown has Victorian terraces and newer housing along the Bann.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Craigavon | On the drive. | With the householder. | Estate house board changes. |
| Moira | Along the kerb. | By appointment. | Cottage board upgrades. |
| Portadown | Outside the house. | Via the owner. | Terrace board changes. |
Getting from Markethill to Lurgan is quick, so a board change can be fitted into a normal working day, with a quick look at the existing fuse box arranged first. Photographs of the old board often tell us what parts to bring.
Suppose a landlord in Lurgan has a let terrace with a fuse box under the stairs, two circuits and a tenant who keeps tripping the kitchen. We would test the circuits, replace the board with a modern unit with several protected ways, separate the kitchen, and label everything before the tenants return.
Board changes can happen in any month. Landlords often schedule them between tenancies, and buyers ask for them straight after completion.
Lurgan's older streets were built in the days when linen was a main trade.
The town's large park is overlooked by a nineteenth-century house built as a castle.
Houses in the town carry boards of every generation, from ceramic fuses to recent units.
Often most of a day, depending on the number of circuits and how accessible the old board is.
Yes, for several hours, while the old board comes out and the new one is connected and tested.
Not always. If the cables test sound, they can stay. A test shows whether they do.
Modern units include devices that cut the supply quickly if there is an earth fault or an overload, which old fuses do not offer.
Yes, every way is named at the board, and a copy of the list goes with your test record.
You are told straight away, and the options are explained before any extra work.
Message the address and a photo of your fuse box, and a day will be suggested.
Request a quote
Still running on an old fuse box in Lurgan? Message the address and a photo of the box, and a day for the change will be suggested.
07833 228966