When an electrical job in Lurgan is finished, somebody has to prove that it works and write down the proof. Closing tests, commissioning, then a certificate for our own work, explained line by line.

Call 07833 228966

Electrical work around Lurgan

Work in Lurgan ranges from a rewired terrace to a refitted shop unit in a converted mill, and in every case the end of the job brings the same questions. Does each new circuit do what it should? Do the protective devices trip when they are meant to? Is the earthing sound? An owner, a landlord or a lender may want the answers on paper, and a trade that cannot supply them leaves the customer exposed. We test each circuit we have fitted or changed, record the readings and write them into the paperwork before we leave.

Commissioning goes a step further for equipment that needs setting up, such as extraction, heating controls or machinery. We commission the electrical side, meaning the supply, the protection and the connection, and where the maker or installer must set up the equipment itself, we say so and arrange to be there at the same time if that helps. Work by other trades is named as theirs in the paperwork, so nobody mistakes our certificate for a statement about things we did not do. Sometimes the paperwork is needed for a reason that has nothing to do with the electrics themselves: a lease, an insurance renewal, a sale. We ask what the certificate is for, because the answer shapes what the reader needs to see, and a document that answers the real question saves a second round of letters. We also keep our test sheets for each job, so that a request that arrives long after the work can still be answered from the original readings.

About this service

Lurgan finish: every circuit we fitted or changed tested, protective devices proved, earthing and bonding checked, each reading recorded. New supplies and equipment are commissioned on their electrical side, with the maker brought in where needed; our certificate follows and its contents are explained to you line by line.

What to settle before a Lurgan job closes

Lurgan-area projects we prove and certify

Craigavon

Craigavon's retail units and offices often finish fit-outs together, so testing and paperwork can be done in one visit.

Moira

Moira has village shops and converted farm buildings where each project is certified on its own.

Waringstown

Waringstown's older cottages and small businesses often have new circuits added to old boards.

Practical notes by area
AreaVan parkingAccessTypical jobs
CraigavonInside the service yard.Down the loading bay.Fit-outs.
MoiraBeside the unit.Through the yard.Small projects.
WaringstownOn the lane.Down the passage.Alterations to older properties.

Travel from Markethill

Lurgan is a short drive from our base at Markethill, so a closing visit, any retest and the handover of paperwork can be arranged without delay.

A typical enquiry

Picture a café in a converted mill unit that has just had new lamps, power points, a kitchen extractor and a replacement board. We test each new circuit, prove the extract's supply and its protection, and give the owner our certificate, with a copy to the landlord if the landlord asks.

Timing the work

Lurgan projects pile up before a financial year end or a lease date, so book the closing tests early.

Local knowledge

Mill conversions

Many Lurgan business units are in former linen buildings, where new work often joins old wiring.

Several parties

A lender, a landlord and an insurer may each want paperwork, so the format matters.

Near the lough

Lough Neagh's southern end lies a little way from Lurgan, so damp can affect outdoor and cellar circuits.

Questions we are asked

Who is the certificate handed to?

It goes to whoever ordered the work, and copies can be passed to a landlord, lender or insurer.

What happens with work done by other trades?

Our paperwork names the parts that are ours and the parts that belong to others.

Does the certificate cover an extractor or heating system?

Ours is the supply and its connections on the electrical side. Setting up the equipment itself may be a job for the maker.

When does the paperwork come through?

Commonly within a few days of testing, though a large fit-out takes longer.

My landlord wants another format. Can you help?

Say so early; we will explain what is possible.

Do you test again if the work changes later?

Yes, for any part the later work touches.

What do you need from me to arrange a visit?

Address, work done and the name of whoever is asking for the paperwork.

Request a quote

Electrical Certification & Commissioning in Lurgan

Finishing electrical work in Lurgan? Use the form to send the street address and name whoever should receive the paperwork, and we will book a visit.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966