Lisburn
Lisburn, the city a few miles north, has infill houses, estates and large extensions.
STEPHEN BROWNELECTRICAL County Down · New Build & Self-Build Electrical Services
Moira is a desirable village within commuting reach of Belfast, and demand for plots, rebuilds and big extensions is steady. We handle the wiring of new houses and major building projects here, from the first cable laid to the final tests.
Growth in a commuter village is mostly incremental. A garden is split for a second house, an old bungalow is knocked down and replaced by something larger, a barn at the edge of the village becomes a home. Each project needs its own electrical plan, and each has to fit neighbours, roads and services that are already there.
Rebuilds raise a question that new plots do not: what should happen to the existing supply? The meter position, the incoming cable and the earthing arrangements may all be fine, or they may be a decade past their best, in which case replacing them while the site is clear is far less disruptive than doing so later. A survey before demolition tells you what can be kept and what should be redone.
On a new build we run the cabling once the building is closed in, then return after plastering to fit switches, sockets, light fittings and the consumer unit, and finish with a full set of tests. We help you plan the layout of circuits before the walls go up, coordinate with your builder on dates, and hand over a written record. If plans change during the build, we explain what each alteration means for the cabling before agreeing it.
Lisburn, the city a few miles north, has infill houses, estates and large extensions.
Hillsborough, a Georgian village, sees sympathetic extensions and conversions of outbuildings.
Lurgan lies to the south-west, with infill plots and edge-of-town sites.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Lisburn | Along the nearest side road. | Through the site gate, with the foreman. | Estate homes and rebuilds. |
| Hillsborough | In the lane beside the plot. | With the owner. | Extensions in sensitive settings. |
| Lurgan | Close to the entrance. | Via the builder. | Self-builds on spare plots. |
Moira is an easy drive from Markethill, which keeps site meetings and finishing visits easy to fit around the building programme.
Suppose a family replace a 1950s bungalow in the village with a two-storey house. Before demolition we survey the supply and meter, then plan the circuits for the new layout, wire the shell once the roof is on, and return for second fix after plastering.
Winter slows groundwork, but electrical first fix can proceed once the roof is on. Booking your slot when the walls go up avoids a gap between the trades. A first-fix date fixed early also helps the plasterer, who cannot start until the cables are in.
The village grew under the Rawdon family from the seventeenth century.
Moira Demesne survives beside the village as parkland.
Good road and rail links make the village popular with people working in Belfast and Lisburn.
Yes. We can note the meter position, the incoming cable and the board, so you know what can be reused and what the network operator needs to be told.
As early as possible. Connections for new houses can take months, and the programme depends on it.
Yes, room by room, using your drawings and your furniture plan.
Yes. We review them, raise questions and suggest changes that make the cabling simpler.
Yes. We allow for capacity in the board and plan cable routes accordingly.
A document recording what was installed and what the tests showed.
The plot's location, the type of build, any plans that exist and the dates you are aiming for.
Request a quote
Building, rebuilding or extending in Moira? Pass on the plot's location and any drawings, and a site meeting will be arranged.
07833 228966