Moy
Moy lies on the River Blackwater, just across the county line in Tyrone, with new homes and conversions appearing around the village.
STEPHEN BROWNELECTRICAL County Armagh · New Build & Self-Build Electrical Services
Richhill sits in open countryside between Armagh and Portadown, with plots for new homes dotted along its roads. Self-builders and small builders can book us for the full run of first fix, second fix and certification.
Builds in a village setting are often one-off houses, bungalows or conversions. Owners may manage the project themselves or through a small builder, and the electrical work has to fit with their pace rather than a large contractor's programme.
We keep communication simple. A short list of decisions we need at each stage, such as socket positions, lighting choices and meter location, helps owners keep control of the programme.
For Richhill builds we put in first fix cable and second fix accessories, along with the layouts for lights and sockets, the board, and testing and certification, each agreed in writing beforehand.
Moy lies on the River Blackwater, just across the county line in Tyrone, with new homes and conversions appearing around the village.
Portadown is a larger town with new housing and commercial buildings around its edges.
Dungannon is a busy County Tyrone town, and building continues around its edges as well as in the centre.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Moy | Plots near the village usually have space for the van off the road. | Via the gateway of the plot, opened by the owner or builder. | Conversions and new houses on village plots. |
| Portadown | Site parking is arranged in advance. | Through the site entrance after the builder's induction. | First fix and second fix. |
| Dungannon | Larger sites generally offer a compound; small ones need a bay arranged. | Through the compound gate, with the site manager's agreement. | Small developments and commercial fit-outs. |
Richhill is a short drive from Markethill, and we can plan site visits during a build alongside other work in the area, which keeps return visits easy to arrange.
A homeowner converting an outbuilding into a dwelling might want the electrics planned with the layout. We would visit, check what is already there, and propose a plan for first fix, second fix and testing, with a note of what we need from them.
Building work slows in winter, and electrical stages move with it. Tell us about programme changes as early as you can. Open countryside plots are exposed to wind and rain, which can interrupt groundwork, so it is worth keeping a loose date for first fix rather than a fixed one.
Richhill Castle, a seventeenth-century house, is the focus of the village's history.
The village sits on routes between Armagh and Portadown, which makes it accessible for builders and suppliers.
Plots range from village infill to rural sites, and each calls for a slightly different supply plan.
Yes. We explain what we need at each stage so you keep control of the programme.
Yes. We inspect the building, plan the layout and describe the stages before starting.
Yes. We test on completion and provide documentation appropriate to the work.
We can suggest options based on how you use each room and describe what each would involve.
Usually at second fix, though the position is decided before first fix.
We can discuss cable routes and board space so that a later installation is easier.
Plans, if you have them, and a short description of the project.
Request a quote
Building near Richhill? Send us the details and we will get back to you to arrange a chat about the work.
07833 228966