Tandragee
Farms on the slopes above the Cusher at Tandragee often have lane-end sheds that rely on a single cable from the yard, which makes route checks especially useful.
STEPHEN BROWNELECTRICAL County Down · Agricultural Electrical Inspection & Testing
Farm electrics around Gilford work hard in damp, dusty and sometimes corrosive buildings. We inspect and test the installation, then give you a written account of what we found and what ought to be done.
Livestock buildings are tough on wiring. Moisture settles on fittings, slurry and silage give off gases that attack metal, rats gnaw at cable, and sockets in a parlour or workshop are hit by hoses and buckets every day. Farms in the Gilford valley run all of that on top of long cables that link the house to sheds scattered across the holding. Because milking herds, beef stock and tillage all sit a short walk apart here, our visits take in everything from a milking plant with a heavy motor load to a grain store where dust is the main enemy. Inspection is how a slow decline gets caught before a breaker starts dropping out at the busiest hour of the farming year.
An inspection begins with a look at the installation: the main board, the sub-boards in outbuildings, cable runs, enclosures, sockets and the condition of any equipment bonding. We then carry out measured tests on the circuits, checking among other things that earth connections are sound, that insulation has not broken down and that protective devices will react quickly if something goes wrong. Findings are set down in a written report, with the urgent matters separated from the ones that can wait for a quiet month. We note anything we could not reach, such as a sealed junction or a locked building, so that no gap in the picture is hidden. Insurers, lenders and inspectors sometimes ask for such a report, and you may wish to check with them what they need.
On a Gilford farm we look over the main intake, outbuilding boards, cable routes, sockets, lighting and fixed equipment connections, and then test the circuits. You receive a written account noting defects, their urgency and any areas that were out of reach.
Farms on the slopes above the Cusher at Tandragee often have lane-end sheds that rely on a single cable from the yard, which makes route checks especially useful.
Holdings on the outskirts of Portadown, close to the Bann, handle damp as much as anything, so earthing and moisture-resistant fittings are looked at closely.
Around Banbridge the sheds on a single farm may span several eras, and an inspection helps show which parts of the wiring have aged most.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Tandragee | Layby near the lane gate | Along the hedge-side track | Hillside farm sheds |
| Portadown | Hard core beside the dairy | Through the wash-down bay | Damp, riverside yards |
| Banbridge | Spare corner of the yard | Round by the newer shed | Farms with older sheds |
Gilford is a manageable drive from Markethill, so we can plan a testing day with you in advance and keep to it around the farm's routine.
Consider a dairy farm near Gilford whose lender wants current evidence of the wiring. We would test the board in the house, the parlour sub-board and the sheds beyond it, record a cracked isolator and a damaged socket, and put those first on the list in the written report.
Winter damp reveals weak spots quickly, so many farms choose a testing day during the calmer stretch that follows the main spring work.
Dairy, beef and arable holdings sit beside one another around Gilford, and each places its own demands on the wiring.
Mill work and the linen trade built up the homes here, so older buildings beside the farms may hold cable from several periods.
Banbridge, Tandragee and Portadown are all near, which means the farms we test often sit between several market towns.
An inspection is a systematic check and measurement of the whole installation. A repair visit deals with one known problem.
Yes. Boards, cables and sockets in sheds, parlours and workshops are included wherever we can safely reach them.
We try to plan around it. Where a supply must be off for a short while, we agree the timing with you first.
You hear about it on the spot, along with the nature of the hazard and the quickest sensible remedy, and it goes into the report as well.
Some insurers ask for one. Check with your own insurer what they want, and we will gladly describe how ours is set out.
The time varies with how many sheds and circuits there are. Once we know what stands on your holding we can give a rough idea.
Send the form a few lines on the buildings and equipment, and we will suggest dates that suit your farming calendar.
Request a quote
Is a Gilford farm overdue a proper electrical check? Tell us about its buildings in the enquiry form and we will talk through dates.
07833 228966