Banbridge
Newer houses fill the roads on the outskirts of Banbridge, a short way east, and many are completed in stages.
STEPHEN BROWNELECTRICAL County Down · New Build Second Fix Electrical
Second fix is when a new house stops looking like a building site and starts to behave like a home, and the electrical work is what makes it so. In Gilford we put on the accessories, wire the board and prove each circuit once the plastering and decorating are done.
By the time second fix arrives at a Gilford property, the cables have been waiting in the walls for weeks, with their tails coiled and labelled behind the boxes. The walls are plastered, the floors are down and the decorators have usually made their first pass. This is the quiet stage in which every earlier decision becomes visible: a switch that sits a little too high, a socket tucked behind a radiator, a light that no longer lines up with the kitchen units. Because houses around the village range from compact infill builds to roomy farm-side homes, the volume of fittings varies greatly, but the principle is the same.
We strip back each tail, connect it to a switch, socket, spur or fitting of the chosen style, and straighten each faceplate against the wall. Light fittings, extractor fans, heating controls and any fixed appliances go on next. At the board we terminate each circuit, label it clearly and fit the protective devices. Throughout, we try to keep the new paintwork clean, and we cover floors where needed. Once everything is connected, we go room by room and test, so that nothing is switched on for the first time without a check. Faults found at this point, such as a reversed connection or a damaged tail, are put right before the keys are handed over.
For second fix in Gilford we fit all sockets, switches and light points, connect the consumer unit, label the circuits and carry out a round of tests on each. Any decorative fittings you have chosen are installed too, and we keep paintwork protected as we go.
Newer houses fill the roads on the outskirts of Banbridge, a short way east, and many are completed in stages.
North-west along the Bann, plots near Portadown often see owners finishing a home room by room.
Some new houses on the Tandragee hill are reached along tight lanes where deliveries need planning.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Banbridge | Block-paved apron at the new build | Through the porch | Completed estate houses |
| Portadown | Stone track end | Back utility door | Staged home completion |
| Tandragee | Wide section of lane | Climbing the lawn stairs at the side | Hillside new homes |
Reaching Gilford from Markethill is no trouble, so second fix is simple to schedule around decorators and flooring teams.
Consider a new bungalow in Gilford with painted walls and a fresh kitchen. We would arrive with the drawing, fit every plate and light, connect and label the board, then test each circuit and mark any snag on a list for the builder.
Cold, damp weeks slow decorating, so second fix is best timed after paint has dried properly.
Some of Gilford's older streets date from the linen years, and new homes sometimes sit beside them.
Houses near the River Bann often call for particular care with moisture in outbuildings and porches.
Joiners and decorators are readily found among the neighbouring towns, so visits between trades are easy to arrange.
After plastering, flooring preparation and decorating, once walls are dry and the house is clean enough to take fittings.
We can supply standard accessories or fit the ones you have chosen, as agreed beforehand.
Yes. The board is connected, each way is labelled and the protective devices are fitted at this stage.
Before each circuit is switched on we measure its continuity and insulation and watch it operate, writing down every reading.
Yes, as long as they are suitable for the room and the circuit; show us the box or data sheet if you are unsure.
We list them, deal with ours straight away and tell the builder about anything that belongs to another trade.
Send the address area, the progress of the build and your hoped-for dates, and a visit can be confirmed.
Request a quote
House in Gilford nearly ready for its fittings? Get in touch and we will agree a second fix date.
07833 228966