Electrical cable runs tidiest while the walls of a new house are still open, which is the point of first fix. In Gilford we place boxes, route cable and mark out the board before the plasterers turn up.

Call 07833 228966

Electrical work around Gilford

New homes and large extensions near Gilford are built on very different ground. A plot in the village may be a tight infill with neighbours close on each side, while a house on the farmland of the Bann valley might sit far back from the road with a long run for the incoming supply. Soil, slope and distance all influence where the meter and consumer unit end up, and those choices are worth settling before a single wall is closed. First fix is where the drawings are turned into actual cable, so tidy work at this point pays off for the lifetime of the house.

With blockwork or studs standing and floors open, we screw back boxes in at the levels you signed off, drill and run cable in supported lines, and leave a labelled tail at every point. The cooker, shower and thermostat feeds, plus a car charger cable if wanted, are put in on that same trip together with lighting and data routes. We check each position against the plan before covering anything and work around the bricklayer, joiner and plumber so that nobody has to undo another trade's efforts. Because Banbridge, Tandragee and Portadown are all near Gilford, builders arrive from several directions, and we keep a written note of what has been completed so that anyone on site can see the progress.

About this service

On a Gilford new house we mount the back boxes, route and clip the cabling, decide where the consumer unit enclosure sits and tag each circuit at either end. Ahead of plasterboarding we walk through with you or the builder so any missing point can be added while the walls remain open.

What to have ready for first fix

Building areas near Gilford

Banbridge

Beyond Gilford to the east, the approaches to Banbridge are lined with farm sheds of mixed ages, and new dwellings are sometimes built beside them.

Portadown

Out along the river near Portadown, new dwellings and extensions are added to existing smallholding plots.

Tandragee

Farms on the Tandragee slopes sit at the end of tight lanes, so materials and supply cable need careful routing.

Practical notes by area
AreaVan parkingAccessTypical jobs
BanbridgeHardcore by the site cabinAcross the bare slabRural new houses
PortadownCleared corner of the fieldIn by the unfinished end wallFarm-plot dwellings
TandrageeWidened gateway on the lanePlank across the trenchSloping-plot builds

Travel from Markethill

We drive to Gilford from Markethill, and builders find it easy to book first fix as the shell nears completion because we can plan the travel around other work in the valley.

A typical enquiry

Say a family is raising a two-storey house on a Gilford plot with a long drive. We would agree box heights from the drawing, run the cables as the carpenters finish the first floor, and call the builder in to check every point before the plasterboard goes up.

Timing the work

Dry spells are kinder to open walls, so scheduling first fix for a dry week keeps cable and boxes clean.

Local knowledge

Valley farmland

Dairy, beef and arable units divide up the valley farmland here, so new houses are often built near working yards.

Village shaped by mills

Newer homes frequently stand beside older terraces from the milling and linen era.

Castle neighbour

The Scots Baronial castle by the village, built about 1865, is a known marker when giving site directions.

Questions we are asked

At what stage of a Gilford house should wiring first fix be arranged?

Once the walls and floors are up enough to fix to, and while the roof is going on, so the walls can be closed soon after.

Is the board itself connected during first fix?

We position the enclosure and run the cables to it, while the connecting up comes at second fix.

Can cables for a car charger be included?

Yes, the cable route and a spare way in the board can be provided now, even if the charger is added later.

Who decides where the sockets go?

You do, helped by the drawing. We can plan the positions with you, then follow the sheet on site.

What if the plan changes after first fix?

Alterations are still possible before boarding, but they cost much more effort once walls are closed, so please tell us early.

Will you fit round the joiner and plumber?

We do. We agree an order with the joiner, plumber and plasterer so that work flows without undoing.

How do I book first fix in Gilford?

Tell us about the build, its stage and your target dates, and a site visit can follow.

Request a quote

New Build First Fix Electrical in Gilford

Building a house or extension in Gilford? Send us the drawings and the first fix can be talked through.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966