Dead and Live Testing
Testing starts with the supply isolated, checking continuity of conductors and insulation, then moves to live checks of earth fault loop impedance and the response of protective devices once it is safe to energise.
STEPHEN BROWNELECTRICAL Electrical Testing, Inspection & Certification
New electrical work is not really complete until it has been proved and the proof recorded. Stephen Brown Electrical carries out the final tests, commissioning checks and certification for projects across County Armagh.
Certification and commissioning come at the end of an installation, and they answer a simple question: has the work been tested and does it perform as designed? Before a new supply is energised for normal use, the circuits are tested for continuity, insulation and protective device response, and the readings are entered against each circuit on a schedule. The certificate then records what was installed, who was responsible and the results obtained.
The service is useful to homeowners finishing an extension, to builders and contractors who need the electrical side signed off, and to businesses completing a fit-out. It also covers commissioning, where connected equipment such as heating plant, extraction or machinery is brought into operation. We prove the electrical supply and connections; the equipment maker or an appropriate specialist sets up the equipment's own controls. The paperwork is explained so you know what you are being handed and why it matters.
Testing starts with the supply isolated, checking continuity of conductors and insulation, then moves to live checks of earth fault loop impedance and the response of protective devices once it is safe to energise.
A certificate describes the new or altered installation, the person responsible for the work and the test results, giving you a record to keep with the property or pass to a buyer.
Each circuit has its readings recorded on a schedule, with the protective device, cable type and results entered, so a future electrician can compare later readings against these original figures.
Fixed equipment such as heaters, pumps, extract fans and charging points is checked for correct supply and connection before use, with the equipment's own commissioning left to its manufacturer or installer.
Where the work is a single added circuit or a minor change rather than a full installation, a more limited certificate can be issued after testing the part that was altered.
Give us the details of the work, including who carried it out, when it will be ready and what documents you need. A clear picture of the job at the start avoids delays at the end.
We agree the extent of the testing and the certificates that suit the work, and check that the installation is ready, with covers fitted and circuits labelled, before we attend.
The circuits are tested in sequence, first with the supply off and then energised. Any defect found is reported back so that it can be put right before the certificate is signed.
You receive the certificate and schedules with a short explanation of what each page records. Keep them safely, because they are useful when selling, letting, insuring or altering the property later.
Our base is Markethill, and we certify and commission electrical work across County Armagh, reaching Lisburn, Belfast, Dungannon, Armagh, Newry, Portadown, Lurgan, Craigavon, Banbridge and other towns within roughly 40 miles. The town pages below outline the service locally, so use whichever is nearest your project.
Whether a certificate is needed depends on the work and who is asking for it. Ask the relevant authority or your insurer, and tell us about the job so we can say which paperwork suits it.
We can inspect and test an installation, but we can only certify work that we are satisfied with and responsible for. Otherwise a condition report on the existing work may be the more suitable document.
A certificate records new or altered work at the point it is finished, while an EICR reports on the condition of an installation that has been in use. The choice depends on the age and history of the work.
It is the stage where new equipment is brought into service and its supply and connections are proved. We deal with the electrical side, and the manufacturer or installer handles the equipment's own settings and controls.
Once the installation is complete, with covers fitted and circuits labelled, and before the area is relied upon. Let us know early about the completion date, so the testing visit can be fitted in without delaying your handover.