Call us07833 228966

County Tyrone · Electrical Certification & Commissioning

Dungannon Electrical Work: Commissioning and Final Certification

Once the cables are in and the cover plates are fitted, a Dungannon job still needs its final checks. On our visit we do the closing tests, set up the electrical side of any equipment that needs it, and hand over a certificate that speaks only for the work we did ourselves.

Call 07833 228966

Electrical work around Dungannon

Dungannon, County Tyrone's second town, has a busy mix of shops, offices, workshops, trade units and family homes, and whichever kind of building it is, the last stage of a job throws up the same worries. Has each new circuit been shown to behave as intended? Will the protective devices cut the power when a fault appears? Can the earthing be relied upon? Owners, landlords and lenders often want those answers set out in writing, and a customer who lacks them is left uncertain. The County Tyrone setting also affects how fittings and outdoor circuits age. Before we pack up, each circuit that we put in or changed gets tested, what the instruments show is noted, and the figures go into the paperwork.

Some equipment needs more than a good connection before it can be put to use, for instance extraction fans, heating controls or machines in a workshop. For those jobs we commission the electrical side: the incoming supply, the protective devices and the final connection. Where the manufacturer or installer has to set up the equipment itself, we tell you plainly, and we can arrange to be on site at the same time when that saves a second visit. Anything done by other trades is listed under their name, so our certificate is never read as a statement about work we did not carry out. Copies can go to the owner, landlord, lender or insurer, whoever needs one.

About this service

Our Dungannon handover works like this. Each circuit we put in or changed gets tested, the protective devices are shown to operate correctly, earthing and bonding are inspected, and each reading is written down. Newly supplied equipment is commissioned on its electrical side, with the manufacturer called in where required. Our certificate then follows, and we talk you through what it says, line by line.

Dungannon jobs: decisions to make before sign-off

Tyrone town projects we test and certify in Dungannon

Moy

Moy has village shops and older period houses, and each project there is certified separately.

Loughgall

Loughgall has orchard and farm businesses, and every project there gets its own certificate.

Portadown

Portadown has shops, offices and newer housing estates, and each job there is certified individually.

Practical notes by area
AreaVan parkingAccessTypical jobs
MoyNearby.By arrangement.Village shops.
LoughgallNearby.By arrangement.Orchard.
PortadownNearby.By arrangement.Shops, offices.

Travel from Markethill

Markethill, where we are based, is close enough to Dungannon that a closing visit, a retest if needed and the passing on of the paperwork can be fitted in promptly.

A typical enquiry

Picture a workshop adding a new machine supply and sub-board. Every new circuit is tested, the supply and the protective devices are proved sound, and the owner receives our certificate, with a copy for the landlord if requested.

Timing the work

Deadlines such as a year-end or the start of a lease tend to bunch jobs together, so it is wise to book the closing tests ahead of time.

Local knowledge

Tyrone's second town

Within County Tyrone, only one town has a larger population than Dungannon.

Castle Hill

Castle Hill, the historic core of the town, has a long association with the O'Neill family.

Mid-Ulster

Dungannon sits within the Mid-Ulster council area, and open farmland comes right up to the town's outer edge.

Questions we are asked

Where does the certificate end up?

The person who commissioned the work receives it, and further copies can be sent on to a landlord, lender or insurer.

Which parts of the job do the closing tests examine?

Every circuit we installed or altered, along with the protective devices, the earthing and the bonding.

Will you set up equipment as well?

We commission its electrical side, and we state clearly which parts the manufacturer has to set up.

What happens when something fails a test?

The fault is put right and the test is run again before we sign off the paperwork.

Is it possible to have another firm's work certified by you?

No, our certificate speaks only for what we did ourselves, and other trades are named as responsible for their own work.

How long before the paperwork reaches me?

As a rule it arrives a few days after the final test.

What information do you want before the closing tests are booked?

The site address, a description of the work done and the names of those who need the paperwork.

Request a quote

Electrical Certification & Commissioning in Dungannon

Is your Dungannon job close to complete? Use the form to describe the work and name who needs the paperwork, and a date for the closing tests will be agreed with you.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966