Bessbrook
Bessbrook is a close neighbour, with freshly finished houses beside stone farm buildings.
STEPHEN BROWNELECTRICAL County Armagh · New Build Second Fix Electrical
Second fix is where a new Camlough house starts to feel like a home, because the electrical accessories go on the walls. We fit sockets, switches and lights, connect the circuits at the board and test what we have done.
By second fix, the plaster is dry, walls are painted or close to it and floors are down. In a village between a lake and a mountain, the drying stage matters: moisture sits on walls and in cupboards through much of the year, so we prefer to fit accessories once surfaces are properly dry and the building has been heated for a while. We take the cables left at first fix, strip and terminate them, fix sockets and switches level and tight to the finish, and mount ceiling and wall lights. Fittings are chosen to match the layout agreed earlier, with changes noted so the record stays correct.
The board comes next. The consumer unit goes in next, with each circuit landing on its own protective device and every way labelled clearly. Then we test: continuity, insulation, polarity and the operation of protective devices, with results written down for each circuit. Nothing is energised permanently until those readings are satisfactory. If a problem turns up, such as a cable damaged by a trowel or a box set too deep, we deal with it before moving on. When second fix is complete, the house has live power, working lights and a tested installation, ready for the final certificate and handover that close the job.
On a Camlough new build we terminate the first-fix cables, fit sockets, switches and light fittings, connect and label the consumer unit and test every circuit. The result is a working, recorded installation that is ready for final checks.
Bessbrook is a close neighbour, with freshly finished houses beside stone farm buildings.
Newry's hilly outskirts have finished houses where long supply cables need checking.
Keady lies north-west among farms on high and low ground, and new dwellings keep appearing.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Bessbrook | Gravel strip alongside | Under the carport | Finished new homes |
| Newry | Crushed stone near the entrance | Up the temporary steps | Hillside houses |
| Keady | Lane edge by the plot | Via the scullery | Country new builds |
The drive from Markethill to Camlough is short, so we can come back promptly if the builder moves the programme and the house is ready sooner than expected.
A newly plastered house near the lake has stood through a wet spell, so we hold off until the builder has heated it and the paint is dry. Then we fit every socket and light in a couple of days, wire the board and run the tests. A loose neutral at one light is found and put right before power is left on.
Late autumn finishes often meet damp weather, so allow time for walls to dry before fitting accessories.
Damp from the lake sits on walls and in cupboards for much of the year.
A mountain stands over the village roofs.
The ring of hills around Slieve Gullion is not far away.
Once plaster and paint are dry and floors are laid, so accessories go on clean, finished surfaces.
We can, or fit items you have bought. Tell us which beforehand so nothing is missing on the day.
Continuity, insulation resistance, polarity and the operation of the protective devices, recorded for each circuit.
Yes, the new board is mounted, every way is wired and labelled, and only then is the supply switched on.
We suggest waiting and heating the building. Damp surfaces and unfinished work make results harder to rely on.
We record test results as we go; the final certificate and handover follow in a separate stage.
Send us the address and the state of decorating, and we will fix a start date to suit the other trades.
Request a quote
Is your Camlough house plastered and nearly decorated? Let us know and we will arrange second fix, board connection and testing.
07833 228966