New houses on the slopes around Tandragee are often finished with big windows and long views. We carry out second fix wiring, fitting sockets, switches and lights, connecting appliances and finishing the board, so the new home is ready to live in.
Houses built into a hill tend to have more levels and more staircases than flat-site homes, and the finishing electrics have to reflect that. Two-way switching on stairs, lights at half-landings and external lights on steps are all part of the second fix design.
Exposed positions bring weather considerations to external fittings. Lights, sockets and meter boxes on the outside of the house must be rated for wind and rain, and fixings must suit the render or stone they go into.
We fit sockets, switches, light fittings and extractors, connect cookers, hobs and showers, set up heating controls and terminate every circuit at the consumer unit. Testing follows, and we show you how the board and controls work. External fittings are chosen to cope with the weather, and we point out any item, such as a cooker hood or a shower, whose manufacturer asks for particular installation steps that must be followed. If a part is missing on the day, we say so before we start, and list what we can finish and what has to wait.
Gilford has newer homes on former garden land, close to the Bann, and the occasional rebuilt house on the footprint of an older one.
Scarva has a handful of newer houses beside older ones.
Banbridge has larger houses in newer developments.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Gilford | On the plot. | Via the entrance with the new door. | Family houses with several bathrooms. |
| Scarva | At the roadside. | By the main entrance. | Small infill houses. |
| Banbridge | On the drive. | Guided by the site agent. | Larger detached houses. |
From where we start the day the run to Tandragee is brief, so we can arrive early or return in the evening if the finishing trades have run late. That helps get a new house across the line, and it means a missing item can be fetched and fitted the same week.
Imagine a house built into a slope with three floors and a garage. We would fit two-way switching on the stairs, lights at each landing, sockets in every room, connections for the oven and shower, and weather-rated lights for the front steps. Once everything was connected we would test each circuit from the board, switch every light on and off from both ends of the stairs, check the extractor fans and run through the heating controls with the owner, writing down anything that needs a second look before the keys change hands.
Autumn move-ins are common, with second fix in late summer. Booking us once plastering is complete allows the finishing sequence to be agreed in time, and since hillside builds often run behind in a wet spring, an early conversation helps us move our dates without letting the owner down on moving day.
Slope homes mix floors and half-floors, so switching and lighting have to suit stairs and landings.
The town's name is often linked with the wind, which is a good reminder to fix outdoor fittings robustly.
Houses with views of the castle often have large glazed areas, which shape lighting design.
Yes, as planned at first fix.
Yes, with the heating installer.
We fit weather-rated fittings with good seals.
We can discuss it. Many clients supply their own.
Yes.
We return to correct electrical items.
Tell us when plastering finishes.
Request a quote
If your new house near Tandragee is nearly ready for its fittings, tell us your dates and we will plan the second fix.