Moy
Moy has village-edge plots and conversions, often beside the Blackwater where ground can be damp.
STEPHEN BROWNELECTRICAL County Tyrone · New Build First Fix Electrical
Before a new house in Dungannon is plastered, its cable has to be in place, its boxes set and its board position settled. That first fix stage decides whether the finished rooms feel well wired or constantly in need of an extension lead.
Dungannon is growing outward, with housing on its edges and on gap sites between older streets. Builders working there have a mix of requirements: a family house on an infill plot, a pair of semi-detached homes on the road out of town, or an extension that is almost a second house. First fix has to adapt. On a gap site the supply may need to cross a neighbour's boundary agreement, while on an edge plot the problem is more often distance from the road and the need for a long underground run. We visit before ordering anything, compare the drawings with the ground and record where the meter and board will sit.
In each case we route cable through floors and walls to the drawing, set boxes at the heights marked, and leave room in the board for what owners often add later, such as a garage supply, a charger or an outbuilding. When the work is finished we test each run, label the ends and photograph the cables in the walls. That record is useful years later, when someone wants to fix a picture rail or chase a new socket and would otherwise be guessing where the cable lies.
Electrical first fix work: What Dungannon owners get from first fix is the wiring behind lights, power points, the cooker, the shower and heating, plus boxes set where agreed, a planned supply route and a fixed board position. Your drawings set the scope, we put it in writing, fit in with your builder's programme and test each run, so second fix can go ahead once walls are done.
Moy has village-edge plots and conversions, often beside the Blackwater where ground can be damp.
Loughgall's orchard country offers rural sites some way from the road.
Portadown, a drive east, has housing land on its fringes and gap sites within town.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Moy | Roadside. | Via the lane. | Village plots. |
| Loughgall | Gateway. | With owners. | Rural builds. |
| Portadown | Street. | With builders. | Infill sites. |
A modest drive from Markethill brings us to Dungannon, so visits during a build slot into the builder's timetable.
Picture a pair of houses going up on a gap site off a main road. Meter positions would be agreed with the builder, cable run through both floors of each house, boxes set at the marked heights, and every run tested and photographed before plastering.
Spring starts are common, so autumn and winter are the best months to book first fix.
Dungannon is second only to one town in County Tyrone and draws people from a wide rural district.
The old heart of the town is Castle Hill, long linked to the O'Neill dynasty.
Dungannon lies in the Mid-Ulster council district, an area with plenty of farmland close to town.
When the walls and roof are in place and the plans are agreed, before any plastering begins.
It means chasing plaster, so we ask owners to fix positions on the plans first.
Dungannon owners apply to the utility themselves, and we help fix the position it asks about.
Yes, spare ways on the board and ducts where outbuildings may follow.
Continuity and insulation tests are done on every run before wall finishes go on.
We photograph them in the walls and mark them clearly.
The plans, the address and your target dates.
Request a quote
Building a home in Dungannon? Plans, address and dates sent through the form are enough to arrange a visit.
07833 228966