Gilford
Gilford has new housing on former gardens and fields close to the Bann.
STEPHEN BROWNELECTRICAL County Armagh · New Build First Fix Electrical
New homes in and around Tandragee are often built into sloping ground, with split levels and retaining walls. We carry out first fix electrical wiring on those frames, so cable, boxes and boards are in the right place before plaster covers them.
A house on a slope has more than one ground level. Cable has to climb between floors, pass retaining walls and reach garages built beneath the house, and routes through concrete and block need to be planned in advance as pipes or ducts.
The weather also affects the programme. Wet ground slows foundation work, and a delayed frame pushes first fix back. We stay in touch with the builder to adjust our attendance, so we are neither on site before the frame is ready nor holding up the plasterer.
Our first fix begins with marking positions from the drawings and goes on to cable runs through studs and joists, back boxes, ducts through floors and retaining walls, and the siting of the consumer unit and meter tails. Before plaster, we walk the frame with you to check every position, and we leave circuits labelled ready for second fix.
Gilford has new housing on former gardens and fields close to the Bann.
Scarva is a tiny village, where a new house is a notable event and often individually designed.
Banbridge has housing developments and single plots on its edges.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Gilford | On the plot beside the road. | Via the site entrance with the builder. | Infill houses. |
| Scarva | Beside the plot. | By the track that runs along the plot boundary. | One-off houses. |
| Banbridge | On the plot. | Through the gate. | Detached houses. |
Tandragee is a short drive from our base, so we can be on site quickly if a decision has to be made before plastering. On a hillside plot we allow time to walk the levels and check each position.
Suppose a family are building a three-storey house into a slope, with the garage below and living areas above. We would plan ducts between levels, run cable for lighting, sockets and heating, and position the board where the supply enters, then label circuits clearly. We would also agree with the builder where the ducts pass through the retaining wall, so they are cast in or drilled before waterproofing and not after.
Frames often go up in late spring and summer, with first fix soon after. Contacting us at the design stage lets us flag cable routes and duct positions before the structure is fixed, which on a sloping site can save a day of coring through concrete that could have been avoided with a sleeve put in at the pour.
Homes on the slopes above the Cusher River are often built into the ground, which affects cable routes and damp protection.
New houses near the castle may be subject to design controls, which can affect external fittings and lighting.
Local lore ties the town's name to wind, a fair reminder to fix outdoor fittings firmly on exposed plots.
Through ducts and cavities planned in advance, so cable can be pulled without damage.
Yes, with a suitably protected cable and a small board if needed.
Cable for outdoor lights and sockets should be, because it is far easier before finishes go on.
By choosing suitable cable and ducts, and by keeping routes away from damp zones.
Yes.
We walk the frame with you or your builder. Building control may carry out its own checks.
Once the drawings are firm and before the frame is closed in.
Request a quote
Building near Tandragee? Send us your plans and the electrical first fix on your plot can be talked through.