New Build & Self-Build Electrical Services

New Build Testing, Certification & Handover in County Armagh

When the wiring in a new home is finished, it needs proving before anybody depends on it. Stephen Brown Electrical in Markethill carries out the testing, prepares the paperwork and explains the installation to you.

Call 07833 228966

Testing is where a new installation moves from being a set of connected cables to something that can be signed off. Each circuit is checked with calibrated instruments, the protective devices are proved, and the readings are recorded. If a result is not what it should be, the cause is traced and corrected before the job is called complete.

Handover is the human half of the process. A new owner or tenant should be told where the main switch sits, what each way in the board controls and what the paperwork says. We aim to leave you with an installation you understand, documents you can keep, and a clear point of contact if questions come up later.

What testing and handover involves

Inspection before testing

Before any instrument is connected, the installation is looked over for neat terminations, correct fixings, suitable accessories and clear labelling, since many faults can be spotted by eye before a test is run.

Testing each circuit

Every circuit is tested with appropriate instruments and the readings are written down, so there is a record of how the installation performed on the day it was completed.

Certification and documents

Appropriate installation certification is prepared for the work we have carried out, along with a schedule of the circuits, so that the owner, builder or buyer's representatives can see what was installed.

Board labelling

The consumer unit is labelled in plain wording so each way can be identified quickly, which helps when a breaker trips late in the evening or when someone else needs to work on the house.

A walk through with the owner

We show you the board, the main switch, and any special controls such as dimmers or external lighting timers, and answer questions while you are standing in front of the equipment.

How testing and handover runs

  1. Agree what is being tested

    We confirm which circuits and parts of the installation fall within our work, and who will receive the documents. For larger sites, we also agree the order in which houses are completed.

  2. Check the readiness

    Testing is easiest once accessories are fitted and the supply is available. We confirm with you or your builder that this is the case, so no visit is wasted waiting for power.

  3. Inspect and test on site

    We inspect the installation and test each circuit in turn. If something does not pass, we correct it and repeat the relevant test before moving on to the next.

  4. Paperwork and explanation

    Documents are issued once the results are in, and we walk through the installation with you. You keep the paperwork and know what each part of the system does.

Where we work

Our office is in Markethill, and we test and hand over new electrical installations in County Armagh and areas close by, such as Lisburn, Armagh, Banbridge, Dungannon, Portadown, Belfast, Newry, Craigavon and Lurgan. We typically cover about 40 miles, with local notes on each town page below.

Questions we are asked

When is the right time to test a new build?

After second fix is complete and the supply is available. Testing earlier than that leaves parts of the installation unproved, and we would then have to return, so it is best to book once everything is connected.

Can you test work that someone else installed?

We can discuss it. Our certification covers work we have carried out, so for another electrician's installation we would first need to agree what is being asked, and whether a different kind of report is more suitable.

What paperwork will I receive?

You will be given the appropriate installation certification and test results for the work we have carried out. Keep them safe, since lenders, insurers and buyers may ask to see them.

What happens if a circuit fails a test?

We trace the fault, repair it, then repeat the test. The failure and the correction are part of the normal process, and the job stays open until every reading is acceptable.

Do you handle several houses on one site?

Yes, we can plan handovers for a small development with the site manager. A sensible order is agreed so that each house is tested, labelled and documented in turn rather than all at once.

Request a quote

Finish the installation properly

Tell us when your wiring is due to be finished and who needs the paperwork, then we will plan the testing visit with you. A tidy handover leaves the owner knowing exactly what they have been given.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966