Call us07833 228966

County Armagh · New Build Testing, Certification & Handover

Testing, Certification and Handover for New Builds in Markethill

The last job on a new build is proving that the electrics work as designed and handing the house over with the paperwork a new owner needs. We carry out the final testing, produce the written results and show owners round the installation for new homes and extensions around Markethill.

Call 07833 228966

Electrical work around Markethill

Testing is where an electrical installation stops being a collection of cables and fittings and becomes a system that can be relied upon. Each circuit is checked for continuity, insulation and protection, and the results are recorded. A circuit that tests badly is a circuit that has not been installed properly, and finding that on handover day is far better than finding it a year later.

Handover is as much about people as about numbers. The new owner needs to know where the consumer unit is, which switch controls which circuit, how the heating controls work and who to ring if something goes wrong. A short walk-through at the end of a build saves a great many puzzled phone calls in the first weeks of living in the house.

About this service

With the installation complete, each circuit is tested, the protective devices are proved and the board labelling is checked. The readings are written up with the certificate that covers the parts we installed, and each document is explained in plain terms. We then take the owner round the house, pointing out the consumer unit, the isolators and the heating controls, and answering whatever questions come up. If a test shows a fault, it is put right before handover and the circuit is tested again.

What to expect at the end of a new build

New homes near Markethill where we test and hand over

Keady

Keady's hillsides carry newly finished houses with long views, each needing a final check before the owners move in.

Newtownhamilton

Newtownhamilton has new homes built beside older farm properties, sometimes fed from an older board that also needs checking.

Camlough

Camlough's newer houses climb the slopes below the mountain, with outdoor circuits that need checking in all weather.

Practical notes by area
AreaVan parkingAccessTypical jobs
KeadyBeside the house, off the drive.In at the front door, where the owner is waiting for the walk-through.Handover of one-off houses.
NewtownhamiltonOn the lane, near the gate.Via the front door and then across the yard to the old board.Houses linked to existing farm supplies.
CamloughSettled with the builder, as the lane is tight.Through the main entrance, with the keys from the site contact.Houses with outdoor lighting and garage supplies.

Travel from Markethill

Our base is Markethill itself, so scheduling the final tests around the last of the finishing trades is simple, and a quick return to put right a snag does not cost the builder a week. That helps keep handover dates intact.

A typical enquiry

Suppose a family are about to move into a newly built house. We would test every circuit, check the heating controls and outdoor supplies, produce the written results and spend an hour with the owners walking through the board, the isolators and the controls, answering their questions and leaving a folder of documents.

Timing the work

Families often want to move in ahead of the new school term or the festive season, which makes the final testing a pinch point. Booking it well ahead, once the second fix dates are known, gives a better chance of a smooth handover, with time in hand for the odd snag.

Local knowledge

Moving-in dates

Families building around the village often have to be out of rented or old accommodation by a set date, so a clean handover matters.

Houses on slopes

Houses on higher ground have outdoor circuits and garages that need testing as carefully as indoor ones.

Local builders

Because small local building firms are common, we often work with the same people repeatedly, which helps smooth handovers.

Questions we are asked

What does testing involve?

Each circuit is checked for continuity, insulation and protection, and the results are recorded.

Which documents will I receive?

You receive the test readings and a certificate for the work we carried out, with a plain explanation of what each document is for.

Who arranges inspection by building control?

That is usually the builder or owner. We explain what is needed and provide what falls to us.

What if a circuit fails a test?

We find the cause, put it right and test again before handover.

Can you explain the heating controls?

Yes, along with the board and isolators, during the walk-through.

Do I need to be there?

It is much better if you are, since the walk-through is for you.

When should I book the final testing?

Once second fix dates are known, so the test can follow immediately.

Request a quote

New Build Testing, Certification & Handover in Markethill

Is a new build near Markethill close to completion? Give us the handover date and the final testing can be organised to suit.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966