Before anyone moves into a new flat or house, the electrical installation needs to be tested and signed off. In Belfast we carry out the final tests, issue a certificate for our work and hand the installation over with a clear explanation.
The last stage of an electrical job is the least visible, yet it is the one that tells you whether everything behind the plaster is sound. In a new Belfast property we measure the earth connections, check that the protective devices trip when they should, prove each socket and light circuit, and confirm that the cooker, shower and heating all work from their own supplies. The readings are written down, one circuit at a time, so there is a record that can be examined later.
Handover is as much a conversation as a test. The owner, landlord or developer is shown the main switch, taught what each breaker in the consumer unit looks after and told how to reset one that has tripped. In city developments the buyer may be a first-time owner who has never seen a board, so we use plain language and leave the labels clear. Where a site includes several units, such as flats in a converted mill, we test them one after another and give each its own paperwork, which makes later sales and lettings much more straightforward for everyone involved.
At Belfast handover we test each circuit and protective device, then complete the certificate for our work and label the board. The owner or landlord is then walked through the installation, and any fault found is corrected and tried again before we sign anything off.
Lisburn, to the south-west, has new homes beside farms and equine yards, where outbuilding supplies are tested too.
Moira's working farms off quiet lanes include new dwellings that need testing and a certificate before occupation.
Hillsborough's stone courtyards among Georgian streets contain conversions where new circuits meet older wiring at the board.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Lisburn | Beside the paddock fence | Along the gravel path | Houses with yards |
| Moira | Wide lane entrance | Behind the farmhouse | New farm homes |
| Hillsborough | Inside the arch | Across the cobbles | Courtyard conversions |
Reaching Belfast takes real driving time, so testing days are set with the builder early and one trip covers every unit in a development.
Imagine a landlord completing three apartments in a former warehouse. We would test each flat in turn, correct anything that fails a reading, issue a certificate per flat, label the boards and show the landlord how each consumer unit works before tenants are given keys.
Handover dates drive the diary, so booking the test early avoids a last-minute scramble before completion. If keys are due on a Friday, a Tuesday or Wednesday test leaves room to put right anything that turns up.
As the seat of government for Northern Ireland, Belfast sits beside the Lagan.
Titanic Quarter was laid out over former shipyard ground.
Redundant mills and warehouses across more than one quarter have been given over to retail, workspace and flats.
We check earthing and protective devices, prove every circuit and appliance supply, and record all the readings.
Yes, one for the work we carried out, along with the readings and a labelled board.
Ideally the owner or landlord, so they can be shown the board and ask questions. If that is not possible, we can send a summary.
We correct it, run the test again and only then sign the job off.
Yes, we work through the units in order and issue paperwork for each.
It is common for a solicitor or lender to ask for them, so we provide copies for the owner and builder.
We do, as long as they are part of the installation we have completed.
Request a quote
Handover coming up on a Belfast flat or house? Let us know the completion date on the form and we will arrange the testing visit.