Call us07833 228966

County Armagh · New Build Testing, Certification & Handover

Armagh New Build Electrical Testing and Handover

A new home in Armagh is not finished until its electrics have been tested and the owner understands how they work. We carry out the closing tests, write up the results and hand the installation over properly for houses, flats and extensions around Armagh.

Call 07833 228966

Electrical work around Armagh

Developers and individual owners alike need evidence that an installation is sound. Lenders, insurers and a buyer's solicitor often ask for it, and a tidy set of results saves time when the sale is due to complete. We prepare the documents that belong to our part of the work, and we are open about those that belong to other people.

In apartments and terraces, handover has an extra dimension. Shared supplies, common areas and neighbouring units mean the electrician has to be clear about where their responsibility ends. We record that boundary in the paperwork, so nobody has to guess later who is meant to look after what.

About this service

At the close of the job we test each circuit, prove that the protective devices trip as they should, and confirm that the board is labelled. All the readings go into a written record, along with a certificate for the parts that are ours, and we explain what each page means. A short tour of the finished installation follows for the new occupant. Should a test show a problem, we correct it and retest before the keys are handed over, and we note anything that deserves a second look in the first few months of occupation.

Handing over a city new build

Places around the city where we test and hand over

Loughgall

On the edge of Loughgall, new houses are handed over to families who have waited a long time for the keys.

Killylea

Killylea has a few individually designed houses where owners want a careful explanation of every system.

Hamiltonsbawn

Hamiltonsbawn has family houses on larger plots, where garages and outbuildings need testing as well.

Practical notes by area
AreaVan parkingAccessTypical jobs
LoughgallBeside the house.Through the front door at the agreed hour.Single-house handovers.
KillyleaAlongside the garage.With the owner at the door.Architect-designed houses.
HamiltonsbawnNext to the garage doors.Round the side to the garage.Houses with outbuildings.

Travel from Markethill

A short journey separates our home village from Armagh, so final testing can be fitted to the day the last tradesperson leaves. A quick return to deal with a snag is easy to arrange, which helps when a removal van has already been booked.

A typical enquiry

Suppose a developer has two semi-detached houses nearing completion beside a city road. We would test each installation in turn, record the results, label both boards in the same way and give the two sets of owners a short walk-through, before passing the documents to the developer for the sales files.

Timing the work

Completions often cluster ahead of the spring and autumn selling seasons. Fixing the final test date as soon as second fix is scheduled leaves room to correct any snag before the keys change hands, and avoids a last-minute scramble.

Local knowledge

Closing dates

A new house in the city usually has a closing date attached, so handover has to run to time.

Historic neighbours

Houses built near the centre sit among older buildings, so owners often want their installation explained with extra care.

Fruit country

Houses on the city edge look over orchards, and their outdoor circuits are tested like any other.

Questions we are asked

What paperwork will come with the electrics?

The written test results and any certificate relevant to our work, with an explanation of each.

Can you keep to a developer's schedule?

Yes. Dates are agreed beforehand and the site manager is kept informed.

Do you retest after a fix?

Yes, always.

How are common areas handled?

We record where our responsibility ends and who looks after shared supplies.

Will every circuit be named at the board?

Yes, and each one is checked against the plan.

Can you explain the system to a buyer?

Yes, if the developer arranges it.

How early should I book the tests?

When second fix is scheduled, so the tests follow straight on.

Request a quote

New Build Testing, Certification & Handover in Armagh

Finishing a house in Armagh? Pass on the handover date and the closing tests can be planned to fit.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966