STEPHEN BROWNELECTRICAL County Armagh · New Build Testing, Certification & Handover
A new home in Armagh is not finished until its electrics have been tested and the owner understands how they work. We carry out the closing tests, write up the results and hand the installation over properly for houses, flats and extensions around Armagh.
Developers and individual owners alike need evidence that an installation is sound. Lenders, insurers and a buyer's solicitor often ask for it, and a tidy set of results saves time when the sale is due to complete. We prepare the documents that belong to our part of the work, and we are open about those that belong to other people.
In apartments and terraces, handover has an extra dimension. Shared supplies, common areas and neighbouring units mean the electrician has to be clear about where their responsibility ends. We record that boundary in the paperwork, so nobody has to guess later who is meant to look after what.
At the close of the job we test each circuit, prove that the protective devices trip as they should, and confirm that the board is labelled. All the readings go into a written record, along with a certificate for the parts that are ours, and we explain what each page means. A short tour of the finished installation follows for the new occupant. Should a test show a problem, we correct it and retest before the keys are handed over, and we note anything that deserves a second look in the first few months of occupation.
On the edge of Loughgall, new houses are handed over to families who have waited a long time for the keys.
Killylea has a few individually designed houses where owners want a careful explanation of every system.
Hamiltonsbawn has family houses on larger plots, where garages and outbuildings need testing as well.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Loughgall | Beside the house. | Through the front door at the agreed hour. | Single-house handovers. |
| Killylea | Alongside the garage. | With the owner at the door. | Architect-designed houses. |
| Hamiltonsbawn | Next to the garage doors. | Round the side to the garage. | Houses with outbuildings. |
A short journey separates our home village from Armagh, so final testing can be fitted to the day the last tradesperson leaves. A quick return to deal with a snag is easy to arrange, which helps when a removal van has already been booked.
Suppose a developer has two semi-detached houses nearing completion beside a city road. We would test each installation in turn, record the results, label both boards in the same way and give the two sets of owners a short walk-through, before passing the documents to the developer for the sales files.
Completions often cluster ahead of the spring and autumn selling seasons. Fixing the final test date as soon as second fix is scheduled leaves room to correct any snag before the keys change hands, and avoids a last-minute scramble.
A new house in the city usually has a closing date attached, so handover has to run to time.
Houses built near the centre sit among older buildings, so owners often want their installation explained with extra care.
Houses on the city edge look over orchards, and their outdoor circuits are tested like any other.
The written test results and any certificate relevant to our work, with an explanation of each.
Yes. Dates are agreed beforehand and the site manager is kept informed.
Yes, always.
We record where our responsibility ends and who looks after shared supplies.
Yes, and each one is checked against the plan.
Yes, if the developer arranges it.
When second fix is scheduled, so the tests follow straight on.