Call us07833 228966

County Antrim · New Build First Fix Electrical

First Fix Electrical Wiring for New Belfast Builds

First fix is the stage where a bare frame becomes a wired shell, and it all has to be right before plaster hides it. We carry out the electrical first fix for new Belfast houses, apartments and extensions, working to the drawings and alongside your other trades.

Call 07833 228966

Electrical work around Belfast

New development in and around Belfast ranges from apartments in city blocks to individual houses and rear extensions on established streets. Whichever it is, the first fix visit comes once the walls and roof are up and the joiners have framed the partitions. We run cables through joists, studs and ducts, fix back boxes and mark every position against the plan, then leave the circuits clearly tagged so nobody is left guessing at which cable feeds what.

Timing matters on a busy city site. Scaffolding, deliveries, plumbers and plasterers all compete for the same space, so we agree a sequence beforehand and try to finish ahead of insulation and boarding. Where a scheme sits near older buildings, such as a plot among former warehouses or on cleared land beside a converted mill, we check the drawings against what is actually standing, because dimensions on site sometimes differ from paper. Before we leave, we walk the work with the builder so any omission is caught while the walls are still open and a missed cable can be added in minutes rather than days.

About this service

On a Belfast new build the first fix covers cable runs to every socket, switch and light, boxes for accessories, feeds for cooker, shower and heating, the route to the board position, and any data or alarm cabling requested. Cables are tagged by circuit, and we check them against the drawing before boarding starts.

First fix matters for Belfast new builds

Edge-of-city sites we also wire at first fix

Lisburn

Lisburn's outskirts include farm conversions and new houses next to equine yards, where cable also runs out to stables and barns.

Moira

Moira has working farms along quiet lanes, and new dwellings on those holdings need long supply and sub-main routes.

Hillsborough

Hillsborough's estate farms and stone courtyards suit outbuilding conversions that need careful, tidy cable routes.

Practical notes by area
AreaVan parkingAccessTypical jobs
LisburnBeside the yard wallPast the end wallHouses beside stables
MoiraWide gateway vergeDown the hardcore trackFarm-edge dwellings
HillsboroughInside the courtyardPast the coach houseCourtyard outbuildings

Travel from Markethill

Belfast is reached by road from Markethill, and on larger projects we plan our site days around your build programme rather than a fixed weekday pattern.

A typical enquiry

Picture a pair of terraced houses going up on a cleared city plot. With the roof on and the stud walls standing, we would run the circuits, set back boxes at agreed heights, tag every cable and sit down with the site manager to confirm nothing is missing before the boards go on.

Timing the work

Wet weather makes little difference once the roof is on, so first fix can proceed through the winter.

Local knowledge

Shipyard heritage

The shipbuilders of Harland and Wolff left their mark on the eastern side of Belfast.

Old yard, new streets

Today the Titanic Quarter occupies ground that the yard once held.

Countryside soon begins

Fields and farms start soon beyond the built-up edge of the city.

Questions we are asked

At what point in the build do you wire the shell?

After the roof is on and the partitions are framed, but before insulation, boarding and plaster.

Do I need final drawings before you begin?

They help enormously, because every box and cable run follows the drawing. We can help you finish them first if they are not ready.

Can you wire an extension to an existing house?

Yes. We tie new circuits to the existing board, subject to its capacity, and tell you if the board needs attention.

Are cables left labelled?

Yes, each is tagged by circuit so second fix is quicker and mistakes are less likely.

Will you walk the site before boarding?

We go round with the builder or owner, check against the plan and fix omissions before the walls close.

Do you also fit data and alarm cable?

We can run the cables for them at first fix if asked, ready for specialist equipment later.

Can the scheme be altered once work has begun?

We note the change, adjust the work and agree in writing what it adds.

Request a quote

New Build First Fix Electrical in Belfast

Building in Belfast and nearing first fix? Pass the plans and a likely start date on by the form and a site visit will be booked.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966