First fix is the stage where cables, back boxes and the route to the consumer unit go in while the structure is still open. Stephen Brown Electrical, based in Markethill, plans and carries it out from your drawings.

Call 07833 228966

When a house is a shell of blockwork and timber, every cable can run freely and every box can sit exactly where the plan says it should. First fix is that window. It covers the hidden cabling behind every light, socket, cooker point, shower supply and heating control, and it needs to be finished before plasterboard, insulation and screeds make later changes slow and untidy for everyone on site.

Good first fix starts on paper. Before a single hole is drilled, we read the drawings with you or your builder, mark switch and socket heights, and agree where the board will be mounted. Anything not shown on the plans, such as a garden room supply or a spare conduit, is far easier to settle now than once the walls are closed and painted.

What first fix electrical work includes

Cable runs to every room

Cables are routed through walls, floors and ceiling voids to serve each lighting point, socket, appliance and heating supply shown on the plan, clipped neatly so other trades can work around them without damage.

Back boxes and mounting heights

Boxes for switches, sockets and spurs are fixed at the heights agreed with you, set to suit the finished wall depth so the accessories later sit flush once plastering and decoration are complete.

Consumer unit position

We agree where the main board will live and run the circuit cables back to that point, leaving room for the unit to be fitted later and for extra ways if you add circuits.

Containment and spare routes

Where it makes sense, empty conduit or ducting is left in place for later additions such as outside lighting, data cabling or a vehicle charger, so those jobs do not mean cutting into finished walls.

Coordination with other trades

Plumbers, joiners and heating fitters all work in the same voids as the cables. We agree who works where, label cable ends, and tell you when the wiring is ready for the next trade.

How a first fix job runs

  1. Send the drawings

    Get in touch with your plans, the site location and the stage the build has reached. We look at the drawings first so that the conversation is about your actual house and not a general description of one.

  2. Site visit and scope

    We walk the structure, check the plan against what has been built and note anything awkward. The scope of first fix is then set out in writing, including what is and is not included.

  3. Installation on agreed days

    Work is arranged around the builder's programme so we are on site when walls are open. Cables and boxes are installed to the plan, with positions marked clearly for anyone following us.

  4. Check before closing up

    Before the plasterers or boarders arrive, we check each run and look round the site with you or your builder. Any changes needed at this stage can be made quickly, while the structure is still accessible.

Where we work

Our base is Markethill, and first fix work takes us across County Armagh and the surrounding areas, including Newry, Banbridge, Portadown, Armagh, Dungannon, Craigavon, Lurgan, Lisburn and Belfast. We generally travel up to about 40 miles, and the town pages below add detail for each place.

Questions we are asked

When is the right time to book first fix?

When the walls are built and the roof is on or nearly on, and ideally after the plans have been shared with us. Talking earlier lets us flag positions that need deciding before the walls are built.

Who decides where the sockets and switches go?

You do, with our input. We work from your drawings, suggest heights and positions to suit what each room is for, and mark them on site so everyone can see the plan before cables are fixed.

Can first fix be done on an extension as well as a whole house?

Yes. An extension has the same open stage where cables are easiest to run. The scope is smaller, and it also involves connecting new circuits to the existing board, which we would discuss and agree beforehand.

What happens if the plans change during the build?

Changes are common. Tell us as early as you can and we will adjust the wiring while the walls are open. Anything that alters the agreed work is discussed with you before it goes ahead.

Do you also do the second fix on the same house?

We can. Many clients keep one electrician for both stages because the records from first fix guide the later work. Each stage is agreed separately so you know what is included at every point.

Request a quote

Planning wiring before the walls close

If your build is heading towards the stage where cables need to go in, send us the drawings and tell us where the project stands. We will review them and come back to you with the next steps.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966