Craigavon
Craigavon's edges have seen new housing schemes and infill plots.
STEPHEN BROWNELECTRICAL County Armagh · New Build First Fix Electrical
Portadown continues to grow, with new houses on infill plots, edge-of-town developments and single sites, and almost every one of them begins with the same question: where is the cable going to go? Laying the foundations of the installation before the walls close up is our part of those projects.
Housing schemes run to tight programmes. Dozens of plots may need first fix in a short window, and the electrician must be ready when the frame is. We plan our attendance with the site manager and work through plots in a regular order, so the programme moves.
On single plots, the challenge is more personal. An owner-builder wants answers about positions and loads, and each decision has to be thought through. We spend time with them on site, marking positions on the real frame and explaining the reasons for our suggestions.
The first fix starts with setting out positions from the drawings, then runs cable through the frame, fixes back boxes, puts in containment and sites the consumer unit and meter tails. We check positions with you or the site manager before plaster, and label circuits ready for second fix. On larger sites, we work to the plot schedule provided.
Craigavon's edges have seen new housing schemes and infill plots.
Lurgan has plots and conversions on its fringes.
Banbridge has housing schemes and single plots on the roads out of town.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Craigavon | On site. | Via the site office. | Housing schemes. |
| Lurgan | Beside the plot. | With the site manager. | Infill and conversions. |
| Banbridge | On the plot. | Through the gate. | Detached houses. |
Portadown is an easy drive from our base, so attending a site at short notice to check a detail before plastering is straightforward. On a large scheme, that responsiveness helps keep the programme moving.
Say a small developer is building six houses on an edge-of-town site. Working plot by plot from the drawings, we would set out and run cable on each frame in turn, and leave consistent labelling at each board, ready for second fix.
Builders aim to close in houses before winter, so first fix peaks in late summer and early autumn. An early booking secures a place in the programme, and makes it easier for the site manager to line up the plumber, the heating installer and the electrician in an order that suits all three, with no one waiting on anyone else.
Portadown has expanded on both banks of the Bann, and new housing continues to fill gaps at the edges.
The town's railway past left brownfield sites, some now redeveloped as housing.
Access to sites depends on the town's crossings and approach roads, which we allow for when planning deliveries.
For the size of project we usually handle. Once we have seen the programme we say what we can manage.
We can plan supply and board space for it at first fix.
Usually the developer. We work to it and raise queries.
We work to the drawings for each plot.
Yes, for consistency.
Building control may inspect. We tell you what to expect.
Early, when drawings and programme are available.
Request a quote
For a Portadown build, drawings and a programme are enough to begin planning the first fix.
07833 228966