Call us07833 228966

County Armagh · New Build First Fix Electrical

Killylea First Fix Electrics for New Houses and Extensions

The first fix comes while walls and floors are still open, which is the easiest time to lay electrical cable tidily. At Killylea we wire new houses and extensions before the plasterer and the floor layer arrive.

Call 07833 228966

Electrical work around Killylea

A new house along one of the lanes at Killylea is usually built on its own plot, with plenty of ground around it and no neighbour to share a supply with. That has consequences for the wiring. The meter and board need a sensible home, the cable from the road may have a long way to go, and outbuildings, gates and external lights can all call for their own routes. We like to discuss these things on the plot before the first block is laid, then return when the structure is up and the roof is on.

At first fix the back boxes go in at the levels marked on the drawing, run cables through joists and studs in supported straight lines, and mark every circuit at both ends. Hob, oven, shower and heating controls are wired at the same visit, together with any routes for a charger, data points or an outdoor light. We drill and clip with care so insulation and structure are not harmed, and we fit around the plumber, the joiner and the bricklayer rather than demanding the building be left to us. Before the plasterboard goes up we walk the house with the owner or builder, so a missing point is added while the wall is still open.

About this service

At a Killylea new build we position the board enclosure, fix the boxes, run and support all the cabling and leave labelled tails at each point. We then review the work against the plan on site with the builder or owner, so boarding can begin without anyone doubting what lies behind it.

Preparation that helps first fix go smoothly

Neighbouring sites where first fix takes place

Armagh

Armagh is a few miles off, and farms on its outskirts see new houses and extensions rising beside older farmyards.

Loughgall

Around Loughgall you find plots among the orchards and houses on farm sites, many of them replacement dwellings on the footprint of an older home.

Tandragee

Tandragee has mixed farms on its hillsides, so first fix wiring there often involves a long approach and an exposed site.

Practical notes by area
AreaVan parkingAccessTypical jobs
ArmaghRough ground at the gatewayOver the slab thresholdHouses on farm edges
LoughgallPlot entrance beside the treesPlanks across the footingsReplacement dwellings
TandrageeStone hardcore turning areaUp the steep driveExposed hillside plots

Travel from Markethill

Killylea is a brief drive from Markethill along country lanes, so we can look in on a plot between other jobs and keep pace with the builders.

A typical enquiry

Picture a young family building a bungalow on land beside the lane near Navan Fort. We would meet them on the plot, fix the board position, then return after the roof goes on to run every cable and leave the walls ready for the plasterer.

Timing the work

Book first fix for the point when the roof keeps the rain out, since wet weather in open walls is best avoided.

Local knowledge

Plots rather than streets

No village centre draws the buildings together here; dwellings and farmyards string out along the lanes around Killylea.

Families with long roots

Local holdings are mostly in the hands of long-established families, and many new houses are built on family land.

A cathedral city nearby

The cathedral city of Armagh is a handful of miles away, keeping builders' merchants and architects within easy reach.

Questions we are asked

When in the build should first fix take place?

Once the structure is up, the roof is on and internal walls are framed or built. That way the cable can be fixed in its final position and stay dry.

Do you work from the architect's drawing?

Yes, and where there are no outlet positions marked we can propose them, then agree them with you before cable goes in.

Can you wire for a car charger and heat pump at this stage?

We can run the cables for them now, which is easier than opening finished walls later. The equipment itself is connected at second fix or when supplied.

Who decides where the consumer unit goes?

That is agreed between you, the builder and us, bearing in mind access, the supply route and where the meter sits.

What if the builder moves a wall after you have wired?

Tell us promptly. Altering cable in an open wall is far simpler than after plaster, and we will adjust the runs to match.

Will you tidy up after first fix?

We clear our offcuts and packaging and leave the cables neatly clipped, so the plasterer and carpenter can follow on.

Can you handle a house and its garage or outbuilding together?

We can, running the separate supply or sub-main to a garage or shed in the same visit and noting the route on the plan.

Request a quote

New Build First Fix Electrical in Killylea

Building a house or extension near Killylea? Send the plans with the enquiry form and we will arrange to meet on site and discuss first fix.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966