Call us07833 228966

County Armagh · New Build First Fix Electrical

Getting Loughgall Houses Wired Before the Plaster Goes On

First fix is the moment when walls and ceilings stand open and the electrical wiring can be put in cleanly. We carry it out for new Loughgall homes and extensions before the plasterer arrives.

Call 07833 228966

Electrical work around Loughgall

New homes in this district tend to be generous in size, and many are built on plots that were once part of a farm or orchard. A long drive from the road, a house set back among the trees or a big extension to an existing farmhouse all mean longer cable runs and more thought about where the meter and board should go. First fix is when those decisions become real. Boxes are fixed at heights agreed beforehand, cables run through block walls, studs and joists, and every route is supported so nothing sags once the boards go up.

Because houses here are often large, we plan the runs room by room and circuit by circuit, with tails left long enough to reach the accessory comfortably. Cables for the cooker, the shower, heating thermostats and a possible car charger are installed on that one visit as well, together with routes for lights and data. Each position is compared with the drawing before anything is hidden, and we fit in around the joiner, plumber and bricklayer so nobody has to rip out another trade's work. At the end we walk the building with you or the builder, and anything missing or moved is dealt with while the walls are still open and changes are easy.

About this service

On a Loughgall new build we fix back boxes, run and clip cables, site the consumer unit enclosure and mark each circuit at either end. A walk-round with you or the builder follows, so missed outlets or moved walls are dealt with before any plasterboard goes up.

Things to have in place before first fix

Building plots near Loughgall

Armagh

Armagh city sits south-east of Loughgall, and the farmland encircling it offers plots for new houses and big extensions.

Richhill

Richhill's outskirts have family farms where a son's or daughter's new house is often built near the old one.

Moy

Moy's Blackwater-side holdings offer plots where houses are enlarged or rebuilt.

Practical notes by area
AreaVan parkingAccessTypical jobs
ArmaghPlot entrance by the hedgeOver the block thresholdLarge detached builds
RichhillSpare ground beside the farmyardThrough the open door spaceFamily site houses
MoyLay-by near the plot gateOver the plank rampRebuilds and extensions

Travel from Markethill

Markethill to Loughgall is a brief run, so we can measure up during the build and come back once the frames are ready for cable.

A typical enquiry

Say a builder in Loughgall has raised the blockwork for a four-bedroom house on a former orchard plot. We would meet him at the stage when the first-floor joists are down, run the cables through, leave the tails clearly labelled and walk through each room before the boarding begins.

Timing the work

Dry spells suit first fix well, because the building is easier to move around and cables do not sit in damp.

Local knowledge

Houses that start large

Roomy farmhouses are the local norm, so new homes tend to be sizeable too.

Orchard land nearby

The village is set among the Armagh orchards, so a plot may adjoin working fruit land.

The Tyrone line close by

Loughgall is near the Tyrone boundary, and builders sometimes work on both sides of it.

Questions we are asked

At what stage of a Loughgall build do you want us for first fix?

Once the walls and the roof are up and the joiner has framed the partitions, but before any plaster or boards go on.

Do I need the final drawing before you begin?

It helps a great deal. If you do not have one, we can draw up positions with you before we start.

Where should the board go in a large house?

Usually somewhere central, dry and easy to reach, a utility room or hallway for example. Options are weighed up when we visit.

Can you put in cabling for a car charger at this stage?

Yes. It is far easier to run the cable now than after the walls are finished.

Do you allow for the other trades on site?

We do our best to. Agreeing the order of work with the joiner and plumber avoids anyone undoing another trade's work.

What happens if I change my mind after first fix?

Small moves are easy while the walls are open. After plastering, alterations are slower and cost more disturbance.

Is first fix the same as the final testing?

No. First fix puts the cable in place, second fix fits accessories and connects, and testing comes at the end.

Request a quote

New Build First Fix Electrical in Loughgall

Building a house or large extension near Loughgall? Send a note through the form saying where the plot is and when the frame is due.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966