Call us07833 228966

County Armagh · New Build First Fix Electrical

First Fix Electrics for New Keady Houses Before Plastering

First fix is the stage when the walls are still open and the electrical wiring can be run cleanly. In Keady we put in cables, boxes and containment for new houses and extensions before the plasterers arrive.

Call 07833 228966

Electrical work around Keady

New houses around Keady go up on a range of sites, from village infill plots to open ground on the hillsides that lead towards the Ring of Gullion. Each plot affects the wiring. A site close to the road is simple to reach, while a house set well back up a hillside lane may need a long supply route and careful thought about where the meter and board will sit. The first fix is where those decisions turn into physical cable, so it deserves time and tidy work.

At this stage the block walls, studs and joists are exposed. We fix back boxes at agreed heights, run cables through the structure in neat, supported lines, and leave clear tails at every switch and outlet. Cables for the hob, shower, thermostats and any vehicle charge point are put in at the same visit, as are the routes for lighting and data. Because customers in this area include builders and families from both sides of the border, we confirm positions against the drawing before covering anything, and we try to work around the bricklayer, the carpenter and the plumber so no one has to undo another trade's work. When the first fix is complete the walls can be closed with confidence.

About this service

On a Keady new build we mount the boxes, run and secure the cables, position the consumer unit enclosure and leave every circuit labelled at its start and finish. We walk the finished first fix with the builder or owner before boarding begins, so that any missing outlet or moved wall is dealt with while the walls remain open.

Things to have ready before first fix starts

Building sites near Keady we first fix

Armagh

Armagh, to the north, has estates and rural plots among its fruit and dairy farms where new houses and large extensions are going up.

Newtownhamilton

Newtownhamilton, further south, often involves hill-farm sites where a new dwelling stands in an exposed field with a long entrance lane.

Markethill

Markethill, our home village, has working farmland all around it, and we first fix there for family homes built on land handed down within the farm.

Practical notes by area
AreaVan parkingAccessTypical jobs
ArmaghBehind the site hutOver the hardcore trackEstate house builds
NewtownhamiltonField gateway vergeAcross the open slabRural dwellings
MarkethillIn the unfinished driveThrough the garage openingFamily-plot homes

Travel from Markethill

Keady lies some miles south-west of Markethill, so first fix visits can be fitted around carpenters and bricklayers without long gaps between trades.

A typical enquiry

Imagine a young couple building a bungalow on a sloping plot beneath the hills. We would arrive once the blockwork and roof are on, fix boxes to the drawing, run cables across the open ceiling space, and stand with them as they check each room before the plaster goes on.

Timing the work

Dry spells in spring and summer help first fix run quickly, because the structure is not sodden and cables can be supported properly.

Local knowledge

South of Armagh

Armagh lies roughly seven miles north of the village, so many building customers move between the two.

Border position

The village is close to the border, so builders and owners on both sides of it ask for electrical work here.

Mill and viaduct

Visitors will spot a restored mill and a disused railway viaduct as they arrive.

Questions we are asked

When in the build should first fix be done?

Once the walls, partitions and roof structure are in place and before any plaster or plasterboard covers them.

Will you work from my drawing or the architect's?

We can work from either. If there is no electrical drawing, we can prepare a simple one with you before the first fix begins.

Do you fit the consumer unit at first fix?

We position the enclosure and bring cables to it at this stage, while connecting and testing usually happens at second fix.

Can you wire for an electric vehicle charger now?

Yes. Running the cable while walls are open is far simpler than adding it later, so it is worth deciding early.

What if I change my mind about a socket position?

Tell us before the walls are covered and we can move it. After plastering, changes mean cutting out finished work.

Can you fit around the plumber and the joiner?

We try to. A quick word on site about who is running what, and where, avoids clashes in joists and wall cavities.

Is there a check before the walls are closed?

We walk through with you and compare cables and boxes with the plan, so that anything missing is noticed while it is easy to fix.

Request a quote

New Build First Fix Electrical in Keady

Building a house or extension near Keady? Send the plans through the form and we can arrange to look at first fix before your plasterer is booked.

07833 228966

REQUEST A QUOTE

Tell us about your job.

Share a few details and we will review the work and discuss next steps.
Call us · 07833 228966

Stephen Brown Electrical

Tell us about your job.

Call us · 07833 228966