Poyntzpass
Poyntzpass, south along the canal, sees houses and small units go up on flat, damp ground where cable protection matters.
STEPHEN BROWNELECTRICAL County Down · New Build First Fix Electrical
First fix is the stage in a Scarva new build when the electrical skeleton goes in, before the walls are closed up. We run cables, set boxes and prepare the board position so the rest of the job can follow.
On a new house or extension in Scarva, first fix happens once the frame is up, the roof is on and the internal walls are standing but still open. We work from your approved layout, marking every box position on the studs or blockwork, drilling joists and running cables in tidy groups. Ring mains, lighting loops, cooker feeds and the cable to the consumer unit are pulled through in an agreed order. Clear routes matter, because plasterboard and plaster will hide all of it. We aim to leave each cable labelled at its end so the second fix, later on, goes smoothly without anybody guessing which one is which.
Plots close to the canal at Scarva can be soggy and low, and builders there pay attention to damp-proofing. That affects us too: cables in ground-floor walls and floors are kept clear of anything likely to hold moisture, and outside runs are protected properly. We coordinate with the plumber and the joiner so our routes and their pipes do not fight for the same space. If the design has changed since the drawings were made, tell us before we start, since moving a box is trivial now and a nuisance once the plaster is on. Testing at this stage is limited, with full testing following second fix. Bring any late decisions about extra outlets, outside lights or data points to us now.
For a Scarva build we fix back boxes, run cables through studs and joists, prepare the board position and leave every cable end labelled. The work is carried out to your layout and finished before plastering begins.
Poyntzpass, south along the canal, sees houses and small units go up on flat, damp ground where cable protection matters.
The rural edges of Banbridge see new houses and extensions to older farm buildings, with walls still open for the cable.
Gilford has valley homes and rebuilt farmhouses, many with several storeys of wall to wire.
| Area | Van parking | Access | Typical jobs |
|---|---|---|---|
| Poyntzpass | Gate onto the site | Across the plot | Low-lying plots |
| Banbridge | Lane beside the plot | Via the temporary opening | Edge-of-town houses |
| Gilford | Drive to the build | Front door opening | Larger family houses |
Our Markethill base is close enough to Scarva that we can reach a site quickly when the frame is ready and the walls are open.
Imagine a family building a two-storey home in Scarva with the walls up and the roof on. We mark the boxes room by room, run the cables before the plasterers arrive and leave every end labelled, ready for second fix.
Book first fix once the roof is weathertight, because the plasterers tend to follow soon after.
Ground next to the water stays soaked for much of the year, a point builders keep in mind.
Scarva sits beside the Belfast to Newry road, which helps with deliveries to a site.
This is a County Down village, and the canal is the line with Armagh.
After the walls are framed and the roof is on, but before plaster or boards close the cavities.
We prepare its position and bring cables to it, and usually connect it at second fix.
Yes, before plastering, and the sooner you tell us the easier it is.
We do, keeping within sensible limits and avoiding notching where it would weaken them.
We run those cables now, protected for their route, so no one has to dig up finished work.
Basic continuity checks only; full testing follows second fix once everything is connected.
Pass over the drawings and the date you expect the walls to close, and we will book a site visit.
Request a quote
Building in Scarva? Tell us how far the frame has got and we will agree a date for first fix.